Front of the Meter
Marubeni Corporation | Mibugawa Ina Grid Battery Storage

Location: Ina City, Nagano Prefecture
System : 3 units of Mega Power
Total Capacity : 8.1 MWh (Nominal)
Front of the Meter
Location: Ina City, Nagano Prefecture
System : 3 units of Mega Power
Total Capacity : 8.1 MWh (Nominal)