power-X

Energy Storage Solutions

To establish a brand-new renewable energy grid,
Power X will design and develop energy storage products
at our in-house battery assembly plant.

5GWh manufacturing capacity by 2024

Battery Assembly Plant

  • Battery Assembly Plant, Power BaseBattery Assembly Plant, Power Base
  • Off-the-shelf, CellOff-the-shelf, Cell
  • Grid Battery, Fast EV Charging Battery, Marine Battery, Home BatteryGrid Battery, Fast EV Charging Battery, Marine Battery, Home Battery

Proprietary battery modules, packs and racks built with
safe, high-performance off-the-shelf cells.

Fast EV Charger

Battery-powered EV fast chargers to enable ultrafast
charging without the need for costly construction
or high-voltage contract.

Fast EV Charger

  • 1
    Battery-powered fast EV charger
  • 2
    Equipped with 300kWh of battery capacity
  • 3
    Quick and cost-effective deployment
  • 4
    100+kW high power output

Fast EV Charger

  • Fast EV Charger
  • Fast EV Charger
  • Fast EV Charger

Grid Battery

Capacity 3MWh

Large energy storage solution to stabilize the fluctuating
supply of renewable energy and provide backup
power supply during a power outage.

Grid Battery

  • 1
    Max capacity up to 3MWh per unit
  • 2
    Second & third-life applications enabled
    by unique module design and cloud BMS
  • 3
    Peak shaving with battery storage to reduce utility bills
  • 4
    Uniterruptible power supply to support BCP

Grid Battery

Marine Battery

Safe, high performance marine energy storage
to support the GHG emission reduction from
the marine and shipping industries.

Marine Battery

  • 1
    Marine ESS designed for hybrid & electric ships
  • 2
    Supports the adoption of zero-emmission ship
  • 3
    Large capacity to enable long-distance navigation

Marine Battery

Home Battery

Integrated home battery system that can store over 10kWh of
power for daily and emergency use.

Home Battery

  • 1
    Battery integrated with power conditioner and smart meter
  • 2
    Designed for simple installation
  • 3
    Can be leveraged to reduce energy costs as a VPP
  • 4
    Over 24 hours of power supply during an outage

Home Battery

News

Power Base

Factory of the future
Coming Spring 2024|Tamano City, Okayama

About Power Base

Page top